As part of VDOT's widening of Route 7 at the Dulles Toll Road, new trails have recently opened, including this triple-tunnel underpass of three ramps on the south side of the intersection. As part of the project, the trail will parallel Route 7 the entire distance across Fairfax County. Also, it will connect to an existing trail along Lewinsville Road. This currently goes the entire length of the road except for the last 1000 feet to Route 7. Once complete, it will link the Spring Hill Metro Center with the Spring Hill Recreation Center, which connects to the Potomac Heritage Trail along the Bullneck Stream Valley Trail system.
Nice, will talk soon!
ReplyDelete